Operationally Available Capacity

Last Reviewed Date: 10/31//2017
TSP: 079919091
TSP Name: Black Hills Shoshone Pipeline, LLC
Cap Type Desc: Operationally available unscheduled capacity
Meas Basis Desc: Thousand Cubic Feet
Press Base: 14.90psig @ Northwestern Warren / 14.73psig @ Lane No.9 - Cody
Press Base Desc: Pounds Per Square Inch Gauge
Avail Cap Eff Date / Timesort ascending Avail Cap End Date / Time Loc Prop Loc Name Loc Purp Loc Purp Desc Flow Direction Loc/QTI Qty Avail Scheduled Qty Design Cap IT
12/01/2017 - 8:00am 01/01/2018 - 8:00am 7008 Northwestern Warren MQ Delivery North 2 8500 0 28000 2
12/01/2017 - 8:00am 01/01/2018 - 8:00am 7008 Northwestern Warren M2 Receipt South 1 10500 0 35000 2
12/01/2017 - 8:00am 01/01/2018 - 8:00am 1001 Lane No. 9 - Cody MQ Delivery South 2 10500 0 35000 2
12/01/2017 - 8:00am 01/01/2018 - 8:00am 1001 Lane No. 9 - Cody M2 Receipt North 1 8500 0 28000 2
11/01/2017 - 8:00am 12/01/2017 - 8:00am 1001 Lane No. 9 - Cody M2 Receipt North 1 8500 0 28000 2
11/01/2017 - 8:00am 12/01/2017 - 8:00am 1001 Lane No. 9 - Cody MQ Delivery South 2 10500 0 35000 2
11/01/2017 - 8:00am 12/01/2017 - 8:00am 7008 Northwestern Warren MQ Delivery North 2 8500 0 28000 2
11/01/2017 - 8:00am 12/01/2017 - 8:00am 7008 Northwestern Warren M2 Receipt South 1 10500 0 35000 2
10/01/2017 - 8:00am 11/01/2017 - 8:00am 1001 Lane No. 9 - Cody M2 Receipt North 1 8500 0 28000 2
10/01/2017 - 8:00am 11/01/2017 - 8:00am 1001 Lane No. 9 - Cody MQ Delivery South 2 10500 0 35000 2

Pages

CSV
Comments:
  • Design capacities are based on the maximum allowable operating presure (MAOP) for the pipeline and the normal operating pressures at the delivery point. As such, actual operating capacity may change due to pipeline operating conditions.
  • Qty Avail is the Estimated Operationally Available Quantity which is calculated based on current operating conditions as of the posted date and therefore does not guarantee availability based upon actual operating conditions at any given time.
  • Qualmay is an inactive receipt point that is not flowing. There currently is no scheduled or operationally available capacity available at the point.
  • The pipeline is bi-directional; however if there is any gas flowing in one direction (such as north), then no gas can flow in the other direction (i.e., south).
LOC PURP LOC/QTI IT
M2 - Receipt Location 1 - Receipt point(s) quantity 1 - At least a portion of the capacity being utilized at this location is interruptible.
MQ - Delivery Location 2 - Delivery point(s) quantity 2 - There is not interruptible transportation service as a portion of the capacity being utilized at this location.