Operationally Available Capacity

Last Reviewed Date: 3/26/2018
TSP: 207
TSP Name: Black Hills Shoshone Pipeline, LLC
Cap Type Desc: Operationally available unscheduled capacity
Meas Basis Desc: Thousand Cubic Feet
Press Base: 14.90psig @ Northwestern Warren / 14.73psig @ Lane No.9 - Cody
Press Base Desc: Pounds Per Square Inch Gauge
Avail Cap Eff Date / Time Avail Cap End Date / Time Loc Prop Loc Namesort descending Loc Purp Loc Purp Desc Flow Direction Loc/QTI Qty Avail Scheduled Qty Design Cap IT
10/01/2018 - 8:00am 11/01/2018 - 8:00am 97064-1 Lane 9 MQ Delivery South 2 13500 0 35000 2
11/01/2018 - 8:00am 11/30/2018 - 8:00am 97064-1 Lane 9 MQ Delivery South 2 13500 0 35000 2
03/01/2018 - 8:00am 04/01/2018 - 8:00am 97064-2 Lane 9 M2 Receipt North 1 8500 0 28000 2
03/01/2018 - 8:00am 04/01/2018 - 8:00am 97064-1 Lane 9 MQ Delivery South 2 10500 0 35000 2
11/01/2018 - 8:00am 11/30/2018 - 8:00am 97064-2 Lane 9 M2 Receipt North 1 8500 0 28000 2
12/01/2018 - 8:00am 12/31/2018 - 8:00am 97064-1 Lane 9 MQ Delivery South 2 13500 0 35000 2
04/01/2018 - 8:00am 05/01/2018 - 8:00am 97064-2 Lane 9 M2 Receipt North 1 8500 0 28000 2
04/01/2018 - 8:00am 05/01/2018 - 8:00am 97064-1 Lane 9 MQ Delivery South 2 10500 0 35000 2
12/01/2018 - 8:00am 12/31/2018 - 8:00am 97064-2 Lane 9 M2 Receipt North 1 8500 0 28000 2
05/01/2018 - 8:00am 06/01/2018 - 8:00pm 97064-2 Lane 9 M2 Receipt North 1 8500 0 28000 2

Pages

CSV
Comments:
  • Design capacities are based on the maximum allowable operating presure (MAOP) for the pipeline and the normal operating pressures at the delivery point. As such, actual operating capacity may change due to pipeline operating conditions.
  • Qty Avail is the Estimated Operationally Available Quantity which is calculated based on current operating conditions as of the posted date and therefore does not guarantee availability based upon actual operating conditions at any given time.
  • Qualmay is an inactive receipt point that is not flowing. There currently is no scheduled or operationally available capacity available at the point.
  • The pipeline is bi-directional; however if there is any gas flowing in one direction (such as north), then no gas can flow in the other direction (i.e., south).
LOC PURP LOC/QTI IT
M2 - Receipt Location 1 - Receipt point(s) quantity 1 - At least a portion of the capacity being utilized at this location is interruptible.
MQ - Delivery Location 2 - Delivery point(s) quantity 2 - There is not interruptible transportation service as a portion of the capacity being utilized at this location.